Toto Holding

Charging stations on motorway service areas

In line with European directives aimed at protecting the environment by reducing greenhouse gases and
final energy consumption, to be pursued also by increasing the use of renewable energies, Strada dei Parchi
S.p.A. has appointed Renexia S.p.A. to create, in the service areas located along the motorway section in
granting, new charging infrastructures for electric propulsion vehicles.
The service areas identified for this purpose are Tiburtina Sud, located along the urban penetration section
of the A24 motorway, and Colle Tasso North and South.
The project envisages the subsequent involvement over time of additional areas strategically and
technically suitable.

Service Area TIBURTINA (SOUTH).
The new charging infrastructure will consist of 10 car stalls served by a total of 5 charging columns, each
with double delivery front and capable of charging two vehicles simultaneously. The charging points will be
initially powered, until the adjustment of transmission grid, which will allow the use of the infrastructure in
its final configuration and at full capacity, through a connection of 20.000 V for a power of 400 kW with a
transformer cabinet inside which there will be a reduction of the same up to 400 V by a transformer.
Location: SA Tiburtina sud – A24 Rome-L’Aquila motorway km -5 + 625

Service Area COLLE TASSO (NORTH AND SOUTH)
The new charging infrastructure will consist of 6 car stalls served by a total of 3 charging columns, each with
double delivery front and capable of charging two vehicles simultaneously. The charging points will be
powered by a connection of 400 V for 50 kW. Therefore inverters (AC/DC) will be installed to allow the
current to have suitable characteristics for the operation of the columns.
Parallel to the network connection, the power supply system will include a photovoltaic system that will be
installed above the shelters covering the parking areas, both in the Colle Tasso north and south AS, for a
total power of 30 kW. The photovoltaic station will allow the production of DC electricity from a renewable
source which will be stored in two groups of batteries with a total capacity of 400kW for 600 kWh stored.
Location: Colle Tasso south and north AS – A24 Rome-L’Aquila motorway 11 km + 000