{"id":1037,"date":"2022-04-19T12:58:00","date_gmt":"2022-04-19T10:58:00","guid":{"rendered":"https:\/\/totoholding.it\/?p=1037"},"modified":"2023-04-13T20:02:18","modified_gmt":"2023-04-13T18:02:18","slug":"taranto-offshore-project","status":"publish","type":"post","link":"https:\/\/totoholding.it\/en\/projects\/taranto-offshore-project\/","title":{"rendered":"Taranto Offshore Project"},"content":{"rendered":"\n<ul class=\"wp-block-list\">\n<li><strong>Place:<\/strong> External roadstead of the port of Taranto &#8211; Puglia.<\/li>\n\n\n\n<li><strong>Total production:<\/strong> 58.200 MWh\/year<\/li>\n<\/ul>\n\n\n\n<p>Beleolico S.r.l. is a project company that holds the rights, permits, approvals and clearances for the construction and management of a wind farm in the external roadstead of the port of Taranto (Puglia Region). The wind farm, the first built in the Mediterranean Sea, &nbsp;rises on a water surface of approximately 131.000 square meters and a state-owned maritime area of \u200b\u200b455 square meters.<\/p>\n\n\n\n<p><strong>Description:<\/strong>&nbsp;The plant, the first wind farm in the Mediterranean Sea, consists of 10 turbines with a total capacity of approximately 30 MW and a consequent estimated production of over 58.000 MWh\/year, which corresponds to the energy needs of 18.500 families \/ 60.000 people.<\/p>\n\n\n\n<p>The EPC contractor is Renexia Services s.r.l., a company fully owned by Renexia S.p.a<\/p>\n\n\n\n<p><strong><a href=\"https:\/\/renexia.it\/en\/beleolico-progetti\/\" target=\"_blank\" rel=\"noreferrer noopener\">SCOPRI DI PI\u00d9<\/a><\/strong><\/p>\n\n\n\n<p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The plant, the first wind farm in the Mediterranean Sea, consists of 10 turbines with a total capacity of approximately 30 MW and a consequent estimated production of over 58.000 MWh\/year, which corresponds to the energy needs of 18.500 families \/ 60.000 people.<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"site-sidebar-layout":"default","site-content-layout":"default","ast-site-content-layout":"default","site-content-style":"default","site-sidebar-style":"default","ast-global-header-display":"","ast-banner-title-visibility":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","ast-disable-related-posts":"","theme-transparent-header-meta":"default","adv-header-id-meta":"","stick-header-meta":"default","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","astra-migrate-meta-layouts":"default","ast-page-background-enabled":"default","ast-page-background-meta":{"desktop":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"ast-content-background-meta":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"footnotes":""},"categories":[45],"tags":[55],"class_list":["post-1037","post","type-post","status-publish","format-standard","hentry","category-projects","tag-wind-power"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.1.1 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Taranto Offshore Project - Toto Holding<\/title>\n<meta name=\"description\" content=\"The plant, the first wind farm in the Mediterranean Sea, consists of 10 turbines with a total capacity of approximately 30 MW and a consequent estimated production of over 58.000 MWh\/year, which corresponds to the energy needs of 18.500 families \/ 60.000 people.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/totoholding.it\/en\/projects\/taranto-offshore-project\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Taranto Offshore Project\" \/>\n<meta property=\"og:description\" content=\"The plant, the first wind farm in the Mediterranean Sea, consists of 10 turbines with a total capacity of approximately 30 MW and a consequent estimated production of over 58.000 MWh\/year, which corresponds to the energy needs of 18.500 families \/ 60.000 people.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/totoholding.it\/en\/projects\/taranto-offshore-project\/\" \/>\n<meta property=\"og:site_name\" content=\"Toto Holding\" \/>\n<meta property=\"article:published_time\" content=\"2022-04-19T10:58:00+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2023-04-13T18:02:18+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/totoholding.it\/wp-content\/uploads\/2022\/04\/pale-eoliche-1024.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1024\" \/>\n\t<meta property=\"og:image:height\" content=\"768\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"8vjip\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:title\" content=\"Taranto Offshore Project\" \/>\n<meta name=\"twitter:description\" content=\"The plant, the first wind farm in the Mediterranean Sea, consists of 10 turbines with a total capacity of approximately 30 MW and a consequent estimated production of over 58.000 MWh\/year, which corresponds to the energy needs of 18.500 families \/ 60.000 people.\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"8vjip\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/totoholding.it\/en\/projects\/taranto-offshore-project\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/totoholding.it\/en\/projects\/taranto-offshore-project\/\"},\"author\":{\"name\":\"8vjip\",\"@id\":\"https:\/\/totoholding.it\/en\/#\/schema\/person\/686889d9df78b10efb7f897b2eaf81a3\"},\"headline\":\"Taranto Offshore Project\",\"datePublished\":\"2022-04-19T10:58:00+00:00\",\"dateModified\":\"2023-04-13T18:02:18+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/totoholding.it\/en\/projects\/taranto-offshore-project\/\"},\"wordCount\":142,\"publisher\":{\"@id\":\"https:\/\/totoholding.it\/en\/#organization\"},\"keywords\":[\"Wind Power\"],\"articleSection\":[\"Projects list\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/totoholding.it\/en\/projects\/taranto-offshore-project\/\",\"url\":\"https:\/\/totoholding.it\/en\/projects\/taranto-offshore-project\/\",\"name\":\"Taranto Offshore Project - Toto Holding\",\"isPartOf\":{\"@id\":\"https:\/\/totoholding.it\/en\/#website\"},\"datePublished\":\"2022-04-19T10:58:00+00:00\",\"dateModified\":\"2023-04-13T18:02:18+00:00\",\"description\":\"The plant, the first wind farm in the Mediterranean Sea, consists of 10 turbines with a total capacity of approximately 30 MW and a consequent estimated production of over 58.000 MWh\/year, which corresponds to the energy needs of 18.500 families \/ 60.000 people.\",\"breadcrumb\":{\"@id\":\"https:\/\/totoholding.it\/en\/projects\/taranto-offshore-project\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/totoholding.it\/en\/projects\/taranto-offshore-project\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/totoholding.it\/en\/projects\/taranto-offshore-project\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/totoholding.it\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Projects list\",\"item\":\"https:\/\/totoholding.it\/en\/category\/projects\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Taranto Offshore Project\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/totoholding.it\/en\/#website\",\"url\":\"https:\/\/totoholding.it\/en\/\",\"name\":\"Toto Holding\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\/\/totoholding.it\/en\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/totoholding.it\/en\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/totoholding.it\/en\/#organization\",\"name\":\"Toto Holding\",\"url\":\"https:\/\/totoholding.it\/en\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/totoholding.it\/en\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/totoholding.it\/wp-content\/uploads\/2020\/06\/toto_holding_logo-1.png\",\"contentUrl\":\"https:\/\/totoholding.it\/wp-content\/uploads\/2020\/06\/toto_holding_logo-1.png\",\"width\":244,\"height\":84,\"caption\":\"Toto Holding\"},\"image\":{\"@id\":\"https:\/\/totoholding.it\/en\/#\/schema\/logo\/image\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\/\/totoholding.it\/en\/#\/schema\/person\/686889d9df78b10efb7f897b2eaf81a3\",\"name\":\"8vjip\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/totoholding.it\/en\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/5b6220d64e02eb0c8b94d53c6e9e2dbba2e49eac361c4946739cf6371142ab40?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/5b6220d64e02eb0c8b94d53c6e9e2dbba2e49eac361c4946739cf6371142ab40?s=96&d=mm&r=g\",\"caption\":\"8vjip\"},\"sameAs\":[\"https:\/\/totoholding.it\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Taranto Offshore Project - Toto Holding","description":"The plant, the first wind farm in the Mediterranean Sea, consists of 10 turbines with a total capacity of approximately 30 MW and a consequent estimated production of over 58.000 MWh\/year, which corresponds to the energy needs of 18.500 families \/ 60.000 people.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/totoholding.it\/en\/projects\/taranto-offshore-project\/","og_locale":"en_US","og_type":"article","og_title":"Taranto Offshore Project","og_description":"The plant, the first wind farm in the Mediterranean Sea, consists of 10 turbines with a total capacity of approximately 30 MW and a consequent estimated production of over 58.000 MWh\/year, which corresponds to the energy needs of 18.500 families \/ 60.000 people.","og_url":"https:\/\/totoholding.it\/en\/projects\/taranto-offshore-project\/","og_site_name":"Toto Holding","article_published_time":"2022-04-19T10:58:00+00:00","article_modified_time":"2023-04-13T18:02:18+00:00","og_image":[{"width":1024,"height":768,"url":"https:\/\/totoholding.it\/wp-content\/uploads\/2022\/04\/pale-eoliche-1024.jpg","type":"image\/jpeg"}],"author":"8vjip","twitter_card":"summary_large_image","twitter_title":"Taranto Offshore Project","twitter_description":"The plant, the first wind farm in the Mediterranean Sea, consists of 10 turbines with a total capacity of approximately 30 MW and a consequent estimated production of over 58.000 MWh\/year, which corresponds to the energy needs of 18.500 families \/ 60.000 people.","twitter_misc":{"Written by":"8vjip","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/totoholding.it\/en\/projects\/taranto-offshore-project\/#article","isPartOf":{"@id":"https:\/\/totoholding.it\/en\/projects\/taranto-offshore-project\/"},"author":{"name":"8vjip","@id":"https:\/\/totoholding.it\/en\/#\/schema\/person\/686889d9df78b10efb7f897b2eaf81a3"},"headline":"Taranto Offshore Project","datePublished":"2022-04-19T10:58:00+00:00","dateModified":"2023-04-13T18:02:18+00:00","mainEntityOfPage":{"@id":"https:\/\/totoholding.it\/en\/projects\/taranto-offshore-project\/"},"wordCount":142,"publisher":{"@id":"https:\/\/totoholding.it\/en\/#organization"},"keywords":["Wind Power"],"articleSection":["Projects list"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/totoholding.it\/en\/projects\/taranto-offshore-project\/","url":"https:\/\/totoholding.it\/en\/projects\/taranto-offshore-project\/","name":"Taranto Offshore Project - Toto Holding","isPartOf":{"@id":"https:\/\/totoholding.it\/en\/#website"},"datePublished":"2022-04-19T10:58:00+00:00","dateModified":"2023-04-13T18:02:18+00:00","description":"The plant, the first wind farm in the Mediterranean Sea, consists of 10 turbines with a total capacity of approximately 30 MW and a consequent estimated production of over 58.000 MWh\/year, which corresponds to the energy needs of 18.500 families \/ 60.000 people.","breadcrumb":{"@id":"https:\/\/totoholding.it\/en\/projects\/taranto-offshore-project\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/totoholding.it\/en\/projects\/taranto-offshore-project\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/totoholding.it\/en\/projects\/taranto-offshore-project\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/totoholding.it\/en\/"},{"@type":"ListItem","position":2,"name":"Projects list","item":"https:\/\/totoholding.it\/en\/category\/projects\/"},{"@type":"ListItem","position":3,"name":"Taranto Offshore Project"}]},{"@type":"WebSite","@id":"https:\/\/totoholding.it\/en\/#website","url":"https:\/\/totoholding.it\/en\/","name":"Toto Holding","description":"","publisher":{"@id":"https:\/\/totoholding.it\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/totoholding.it\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/totoholding.it\/en\/#organization","name":"Toto Holding","url":"https:\/\/totoholding.it\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/totoholding.it\/en\/#\/schema\/logo\/image\/","url":"https:\/\/totoholding.it\/wp-content\/uploads\/2020\/06\/toto_holding_logo-1.png","contentUrl":"https:\/\/totoholding.it\/wp-content\/uploads\/2020\/06\/toto_holding_logo-1.png","width":244,"height":84,"caption":"Toto Holding"},"image":{"@id":"https:\/\/totoholding.it\/en\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/totoholding.it\/en\/#\/schema\/person\/686889d9df78b10efb7f897b2eaf81a3","name":"8vjip","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/totoholding.it\/en\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/5b6220d64e02eb0c8b94d53c6e9e2dbba2e49eac361c4946739cf6371142ab40?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/5b6220d64e02eb0c8b94d53c6e9e2dbba2e49eac361c4946739cf6371142ab40?s=96&d=mm&r=g","caption":"8vjip"},"sameAs":["https:\/\/totoholding.it"]}]}},"_links":{"self":[{"href":"https:\/\/totoholding.it\/en\/wp-json\/wp\/v2\/posts\/1037","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/totoholding.it\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/totoholding.it\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/totoholding.it\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/totoholding.it\/en\/wp-json\/wp\/v2\/comments?post=1037"}],"version-history":[{"count":0,"href":"https:\/\/totoholding.it\/en\/wp-json\/wp\/v2\/posts\/1037\/revisions"}],"wp:attachment":[{"href":"https:\/\/totoholding.it\/en\/wp-json\/wp\/v2\/media?parent=1037"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/totoholding.it\/en\/wp-json\/wp\/v2\/categories?post=1037"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/totoholding.it\/en\/wp-json\/wp\/v2\/tags?post=1037"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}