{"id":15952,"date":"2024-10-08T23:29:00","date_gmt":"2024-10-08T21:29:00","guid":{"rendered":"https:\/\/totoholding.it\/uncategorized\/firmato-il-feed-tra-renexia-e-ming-yang\/"},"modified":"2025-04-03T23:34:07","modified_gmt":"2025-04-03T21:34:07","slug":"feed-signed-between-renexia-and-ming-yang","status":"publish","type":"post","link":"https:\/\/totoholding.it\/en\/news-and-press-releases\/feed-signed-between-renexia-and-ming-yang\/","title":{"rendered":"FEED signed between Renexia and Ming Yang for a 2.8 GW floating wind farm off the coast of Sicily after meeting with Minister Urso"},"content":{"rendered":"\n<p><strong>The contract follows the joint signing of a Memorandum of Understanding with the Italian Ministry of Enterprise to start production in Italy of the new 18.8 MW MySE turbines, for more than 1,300 new jobs<\/strong><\/p>\n\n<p>Rome, October 8, 2024 &#8211; Renexia and Ming Yang announce that they have signed a contract in recent days for the Front-End Engineering Design (FEED) of the Med Wind project. The agreement marks another milestone in the development of Med Wind, a 2.8 GW floating wind farm 80 km off the Sicilian coast that will be powered by new Ming Yang turbines.<br\/>In fact, the wind farm will use 18.8 MW turbines (MySE 18-292), for which Integrated Load Analysis has already been initiated and whose prototype is already successfully operational. The synergy between Renexia and Ming Yang grows in the wake of a strategic collaboration to create a factory in Italy capable of producing the most powerful and technologically advanced wind turbines in the world.<br\/>As part of this important project, Zhang Chuanwei, Chairman of Ming Yang Group, and Riccardo Toto, General Manager of Renexia, met again with the Minister of Enterprise and Made in Italy, Adolfo Urso, and Antonio Scino (Chief of Cabinet of the Ministry of the Environment) representing the Italian Minister of Environment and Energy. The meeting followed the signing last August of the Memorandum of Understanding that paved the way for the new investment, which is capable of creating more than 1,300 permanent skilled jobs and opening promising prospects for the start-up of an industrial sector capable of meeting the needs of the Euro-Mediterranean market.<\/p>\n\n<p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The contract follows the joint signing of a Memorandum of Understanding with the Italian Ministry of Enterprise to start production in Italy of the new 18.8 MW MySE turbines  &#8230;<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"site-sidebar-layout":"default","site-content-layout":"","ast-site-content-layout":"default","site-content-style":"default","site-sidebar-style":"default","ast-global-header-display":"","ast-banner-title-visibility":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","ast-disable-related-posts":"","theme-transparent-header-meta":"","adv-header-id-meta":"","stick-header-meta":"","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","astra-migrate-meta-layouts":"set","ast-page-background-enabled":"default","ast-page-background-meta":{"desktop":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"ast-content-background-meta":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"footnotes":""},"categories":[32],"tags":[42],"class_list":["post-15952","post","type-post","status-publish","format-standard","hentry","category-news-and-press-releases","tag-italian-article"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.1.1 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>FEED signed between Renexia and Ming Yang for a 2.8 GW floating wind farm off the coast of Sicily after meeting with Minister Urso - Toto Holding<\/title>\n<meta name=\"description\" content=\"Il contratto segue la firma congiunta di un Memorandum of Understanding con il Ministero delle Imprese italiano per l\u2019avvio della produzione in Italia delle nuove turbine MySE da 18,8 MW, per oltre 1.300 nuovi posti di lavoro\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/totoholding.it\/en\/news-and-press-releases\/feed-signed-between-renexia-and-ming-yang\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"FEED signed between Renexia and Ming Yang for a 2.8 GW floating wind farm off the coast of Sicily after meeting with Minister Urso - Toto Holding\" \/>\n<meta property=\"og:description\" content=\"Il contratto segue la firma congiunta di un Memorandum of Understanding con il Ministero delle Imprese italiano per l\u2019avvio della produzione in Italia delle nuove turbine MySE da 18,8 MW, per oltre 1.300 nuovi posti di lavoro\" \/>\n<meta property=\"og:url\" content=\"https:\/\/totoholding.it\/en\/news-and-press-releases\/feed-signed-between-renexia-and-ming-yang\/\" \/>\n<meta property=\"og:site_name\" content=\"Toto Holding\" \/>\n<meta property=\"article:published_time\" content=\"2024-10-08T21:29:00+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-04-03T21:34:07+00:00\" \/>\n<meta name=\"author\" content=\"8vjip\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"8vjip\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/totoholding.it\/en\/news-and-press-releases\/feed-signed-between-renexia-and-ming-yang\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/totoholding.it\/en\/news-and-press-releases\/feed-signed-between-renexia-and-ming-yang\/\"},\"author\":{\"name\":\"8vjip\",\"@id\":\"https:\/\/totoholding.it\/en\/#\/schema\/person\/686889d9df78b10efb7f897b2eaf81a3\"},\"headline\":\"FEED signed between Renexia and Ming Yang for a 2.8 GW floating wind farm off the coast of Sicily after meeting with Minister Urso\",\"datePublished\":\"2024-10-08T21:29:00+00:00\",\"dateModified\":\"2025-04-03T21:34:07+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/totoholding.it\/en\/news-and-press-releases\/feed-signed-between-renexia-and-ming-yang\/\"},\"wordCount\":279,\"publisher\":{\"@id\":\"https:\/\/totoholding.it\/en\/#organization\"},\"keywords\":[\"Italian article\"],\"articleSection\":[\"News and Press Releases\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/totoholding.it\/en\/news-and-press-releases\/feed-signed-between-renexia-and-ming-yang\/\",\"url\":\"https:\/\/totoholding.it\/en\/news-and-press-releases\/feed-signed-between-renexia-and-ming-yang\/\",\"name\":\"FEED signed between Renexia and Ming Yang for a 2.8 GW floating wind farm off the coast of Sicily after meeting with Minister Urso - Toto Holding\",\"isPartOf\":{\"@id\":\"https:\/\/totoholding.it\/en\/#website\"},\"datePublished\":\"2024-10-08T21:29:00+00:00\",\"dateModified\":\"2025-04-03T21:34:07+00:00\",\"description\":\"Il contratto segue la firma congiunta di un Memorandum of Understanding con il Ministero delle Imprese italiano per l\u2019avvio della produzione in Italia delle nuove turbine MySE da 18,8 MW, per oltre 1.300 nuovi posti di lavoro\",\"breadcrumb\":{\"@id\":\"https:\/\/totoholding.it\/en\/news-and-press-releases\/feed-signed-between-renexia-and-ming-yang\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/totoholding.it\/en\/news-and-press-releases\/feed-signed-between-renexia-and-ming-yang\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/totoholding.it\/en\/news-and-press-releases\/feed-signed-between-renexia-and-ming-yang\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/totoholding.it\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"News and Press Releases\",\"item\":\"https:\/\/totoholding.it\/en\/category\/news-and-press-releases\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"FEED signed between Renexia and Ming Yang for a 2.8 GW floating wind farm off the coast of Sicily after meeting with Minister Urso\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/totoholding.it\/en\/#website\",\"url\":\"https:\/\/totoholding.it\/en\/\",\"name\":\"Toto Holding\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\/\/totoholding.it\/en\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/totoholding.it\/en\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/totoholding.it\/en\/#organization\",\"name\":\"Toto Holding\",\"url\":\"https:\/\/totoholding.it\/en\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/totoholding.it\/en\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/totoholding.it\/wp-content\/uploads\/2020\/06\/toto_holding_logo-1.png\",\"contentUrl\":\"https:\/\/totoholding.it\/wp-content\/uploads\/2020\/06\/toto_holding_logo-1.png\",\"width\":244,\"height\":84,\"caption\":\"Toto Holding\"},\"image\":{\"@id\":\"https:\/\/totoholding.it\/en\/#\/schema\/logo\/image\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\/\/totoholding.it\/en\/#\/schema\/person\/686889d9df78b10efb7f897b2eaf81a3\",\"name\":\"8vjip\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/totoholding.it\/en\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/5b6220d64e02eb0c8b94d53c6e9e2dbba2e49eac361c4946739cf6371142ab40?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/5b6220d64e02eb0c8b94d53c6e9e2dbba2e49eac361c4946739cf6371142ab40?s=96&d=mm&r=g\",\"caption\":\"8vjip\"},\"sameAs\":[\"https:\/\/totoholding.it\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"FEED signed between Renexia and Ming Yang for a 2.8 GW floating wind farm off the coast of Sicily after meeting with Minister Urso - Toto Holding","description":"Il contratto segue la firma congiunta di un Memorandum of Understanding con il Ministero delle Imprese italiano per l\u2019avvio della produzione in Italia delle nuove turbine MySE da 18,8 MW, per oltre 1.300 nuovi posti di lavoro","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/totoholding.it\/en\/news-and-press-releases\/feed-signed-between-renexia-and-ming-yang\/","og_locale":"en_US","og_type":"article","og_title":"FEED signed between Renexia and Ming Yang for a 2.8 GW floating wind farm off the coast of Sicily after meeting with Minister Urso - Toto Holding","og_description":"Il contratto segue la firma congiunta di un Memorandum of Understanding con il Ministero delle Imprese italiano per l\u2019avvio della produzione in Italia delle nuove turbine MySE da 18,8 MW, per oltre 1.300 nuovi posti di lavoro","og_url":"https:\/\/totoholding.it\/en\/news-and-press-releases\/feed-signed-between-renexia-and-ming-yang\/","og_site_name":"Toto Holding","article_published_time":"2024-10-08T21:29:00+00:00","article_modified_time":"2025-04-03T21:34:07+00:00","author":"8vjip","twitter_card":"summary_large_image","twitter_misc":{"Written by":"8vjip","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/totoholding.it\/en\/news-and-press-releases\/feed-signed-between-renexia-and-ming-yang\/#article","isPartOf":{"@id":"https:\/\/totoholding.it\/en\/news-and-press-releases\/feed-signed-between-renexia-and-ming-yang\/"},"author":{"name":"8vjip","@id":"https:\/\/totoholding.it\/en\/#\/schema\/person\/686889d9df78b10efb7f897b2eaf81a3"},"headline":"FEED signed between Renexia and Ming Yang for a 2.8 GW floating wind farm off the coast of Sicily after meeting with Minister Urso","datePublished":"2024-10-08T21:29:00+00:00","dateModified":"2025-04-03T21:34:07+00:00","mainEntityOfPage":{"@id":"https:\/\/totoholding.it\/en\/news-and-press-releases\/feed-signed-between-renexia-and-ming-yang\/"},"wordCount":279,"publisher":{"@id":"https:\/\/totoholding.it\/en\/#organization"},"keywords":["Italian article"],"articleSection":["News and Press Releases"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/totoholding.it\/en\/news-and-press-releases\/feed-signed-between-renexia-and-ming-yang\/","url":"https:\/\/totoholding.it\/en\/news-and-press-releases\/feed-signed-between-renexia-and-ming-yang\/","name":"FEED signed between Renexia and Ming Yang for a 2.8 GW floating wind farm off the coast of Sicily after meeting with Minister Urso - Toto Holding","isPartOf":{"@id":"https:\/\/totoholding.it\/en\/#website"},"datePublished":"2024-10-08T21:29:00+00:00","dateModified":"2025-04-03T21:34:07+00:00","description":"Il contratto segue la firma congiunta di un Memorandum of Understanding con il Ministero delle Imprese italiano per l\u2019avvio della produzione in Italia delle nuove turbine MySE da 18,8 MW, per oltre 1.300 nuovi posti di lavoro","breadcrumb":{"@id":"https:\/\/totoholding.it\/en\/news-and-press-releases\/feed-signed-between-renexia-and-ming-yang\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/totoholding.it\/en\/news-and-press-releases\/feed-signed-between-renexia-and-ming-yang\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/totoholding.it\/en\/news-and-press-releases\/feed-signed-between-renexia-and-ming-yang\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/totoholding.it\/en\/"},{"@type":"ListItem","position":2,"name":"News and Press Releases","item":"https:\/\/totoholding.it\/en\/category\/news-and-press-releases\/"},{"@type":"ListItem","position":3,"name":"FEED signed between Renexia and Ming Yang for a 2.8 GW floating wind farm off the coast of Sicily after meeting with Minister Urso"}]},{"@type":"WebSite","@id":"https:\/\/totoholding.it\/en\/#website","url":"https:\/\/totoholding.it\/en\/","name":"Toto Holding","description":"","publisher":{"@id":"https:\/\/totoholding.it\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/totoholding.it\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/totoholding.it\/en\/#organization","name":"Toto Holding","url":"https:\/\/totoholding.it\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/totoholding.it\/en\/#\/schema\/logo\/image\/","url":"https:\/\/totoholding.it\/wp-content\/uploads\/2020\/06\/toto_holding_logo-1.png","contentUrl":"https:\/\/totoholding.it\/wp-content\/uploads\/2020\/06\/toto_holding_logo-1.png","width":244,"height":84,"caption":"Toto Holding"},"image":{"@id":"https:\/\/totoholding.it\/en\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/totoholding.it\/en\/#\/schema\/person\/686889d9df78b10efb7f897b2eaf81a3","name":"8vjip","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/totoholding.it\/en\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/5b6220d64e02eb0c8b94d53c6e9e2dbba2e49eac361c4946739cf6371142ab40?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/5b6220d64e02eb0c8b94d53c6e9e2dbba2e49eac361c4946739cf6371142ab40?s=96&d=mm&r=g","caption":"8vjip"},"sameAs":["https:\/\/totoholding.it"]}]}},"_links":{"self":[{"href":"https:\/\/totoholding.it\/en\/wp-json\/wp\/v2\/posts\/15952","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/totoholding.it\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/totoholding.it\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/totoholding.it\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/totoholding.it\/en\/wp-json\/wp\/v2\/comments?post=15952"}],"version-history":[{"count":0,"href":"https:\/\/totoholding.it\/en\/wp-json\/wp\/v2\/posts\/15952\/revisions"}],"wp:attachment":[{"href":"https:\/\/totoholding.it\/en\/wp-json\/wp\/v2\/media?parent=15952"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/totoholding.it\/en\/wp-json\/wp\/v2\/categories?post=15952"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/totoholding.it\/en\/wp-json\/wp\/v2\/tags?post=15952"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}