Works to modernise and upgrade to Type 1/b of CNR/80 regulations
- Segment 1 – Section 5 – Lot 3: from 44+100 km to 47+800 km (Contursi interchange included)
- Client: ANAS S.p.A.
- Contract amount: € 154,724,751
The project involves the construction of approximately 7.5 km of a new section of the A3 Salerno – Reggio Calabria motorway. The project’s characteristic features include a twin-tube tunnel, with each tube measuring 2,730 m in length, a steelconcrete
composite viaduct measuring approximately 600 m and lastly a cut-and-cover tunnel measuring 560 m. An embankment road section measuring a total of 3.5 km in length and a 1.5 km interchange ramp, a part of which forms a viaduct, complete the project.