MDEIREJ VIADUCT (25-1)

Hadath – Syrian Border Highway (Lebanon) Length: North 430 m; South 430 m Spans: No. 11 Light: 40 m Max piles height: 70 m Precast concrete: made by Toto The Mdeirej viaduct has a total length of 430 m divided into 11 spans of 40 m, with separate decks and substructures for each carriageway. It

Read More »

MARTIGNANO S.S. 47 VALSUGANA NATIONAL ROAD

S.S. 47 Valsugana (TN) Section: Ponte Alto – Trento Nord (Martignano Alternate Route) Works to widen the Valsugana National Road (S.S.47) Client: Provincia Autonoma di Trento Contract amount: € 111,220,567 The project involves the building of an alternate route to the existing S.S. 47 through the construction of a twin-tube tunnel, with each tube measuring

Read More »

Allocco Tunnel

Length: Northbound barrel (55.69+1,655.07); Southbound barrel (72.12+1693.33) Excavation section: 155 m³    Digging radius: 7.80 m Coating thickness: 60 cm Consolidation: front n. 15÷50 VTR L=15m – contour n. 35÷55 VTR high pressure injected L=15m Driveways and pedestrians by-passes: n. 4 pedestrians + n. 1 driveway The Allocco tunnel (double-barrel tunnel) measures a total length of 3,480 m, divided into the

Read More »

Carestia Tunnel

A24 Strada dei Parchi Length: 830 m Excavation section: 156 m³ Digging radius: 7.70 Coating thickness: 90 cm Consolidation: front no. 30 VTR L = 18 m – contour no. 55 Reinforced micro-piles L = 15 m Vehicle and/or pedestrian by-passes: n. 2 pedestrians, L = 33 m Technological installations: LED handrail on both sides The Carestia tunnel (single barrel) is

Read More »

MESTRE – UDINE RAILWAY LINE

Building works, railway tracks and electrification system needed to widen the railway line on the bridge over the River Tagliamento from 97+954 km of the Mestre – Udine railway line. Client: Ferrovie dello Stato Contract amount: € 3,869,947 The project involves the performance of civil works, railway tracks and electrification works to construct a new

Read More »

GESTIONE GOVERNATIVA SANGRITANA RAILWAYS

Concession contract for upgrading and improvement of the Adriatico Sangritana Railway; Section: Val di Sangro – Archi Station Client: Ministry of Transport Contract amount: € 98,804,805 The project involves the construction of approximately 10 km of new railway in the section between the towns of San VitoChietino and Lanciano, and construction of the section between

Read More »

NATIONAL ROAD E45 ORTE – RAVENNA

Works to build sections adjacent to the towns of Valbiano, Lago di Quarto and Taibo, in Forlì province. Client: ANAS S.p.A. Contract amount: € 89,043,631 The main works involve nine viaducts of a total length of 11,700 m, one of which built using the steel-concrete composite system, two bored tunnels measuring a total of 5,050

Read More »

Flaminia S.S.3

Customer: Anas S.p.A. Work cost: € 77,642,597 This work involved the construction of a section of State Road S. S. 3 Flaminia, between the area of Rome Prima Porta and the Grande Raccordo Anulare. The section that goes from the exit for Prima Porta to the Flaminio cemetery is about 2.5 km long and has the peculiarity of being along the

Read More »

A6 Tourin – Savona Motorway

Performance of works to widen the motorway and improve safety along the Carmagnola – Priero segment Section: Fossano – Priero (Lot 7) and between 43+210 km and 49+935 km (Lot 3) Client: Autostrada Torino – Savona S.p.A. Contract amount: € 73,181,585 The project is split into two lots, Lot 7 consisting in works to widen

Read More »

HADATH-SYRIAN BORDER HIGHWAY

Saoufar-Mdeirej East Section Client: Lebanese Republic Contract amount: € 52,400,771 The project involves the building of a lot of the highway linking Lebanon to Syria, in the section between the towns of Saoufar and Mdeirej. The project’s characteristic features are the two viaducts built with a reinforced concrete framework and prestressed reinforced concrete girders precast

Read More »