Home » Projects list » Projects
Projects
Select one or more
project type

Med Wind
Conceived by Renexia and located in the Strait of Sicily, Med Wind represents the first floating offshore wind farm in the Mediterranean. It will consist of up to 190 floating wind turbines for an installed capacity of about 2.8 GW and an estimated annual production of almost 9TWh.

Taranto Offshore Project
The plant, the first wind farm in the Mediterranean Sea, consists of 10 turbines with a total capacity of approximately 30 MW and a consequent estimated production of over 58.000 MWh/year, which corresponds to the energy needs of 18.500 families / 60.000 people.

Doubling of the Cefalù – Castelbuono railway line
The project involves the executive design and construction of the

Variante di Valico
The Variante di Valico crosses two regions (Tuscany and Emilia Romagna), two provinces (Florence

Pontepo Bridge (Province of Mantua)
Pontepo is an indispensable work for the territory and the

Motorway A24 – Complanari di Roma
Client: Strada dei Parchi S.p.A. Work cost: € 205.445.732 Making

Sparvo plant | tunnel sections
Plant surface area: 5,800 m³ Specialised staff: 93 units Daily

Monte Eboli Photovoltaic Plant
Client: Monteboli S.p.A. (SPV concessionaire of the Municipality of Salerno)

Campagna A3 Salerno – Reggio Calabria motorway
Works to modernise and upgrade to Type 1/b of CNR/80

S. Onofrio A3 Salerno – Reggio Calabria Motorway
Works to modernise and upgrade to Type 1/a of CNR/80

Pontecagnano A3 Salerno – Reggio Calabria Motorway
Works to modernise and upgrade to Type 1/b of CNR/80

State Road 260 “Picente”
The project concerns a section of approximately 6.4 kilometres of

Castelpagano – Pontelandolfo Power Line
The Castelpagano – Pontelandolfo power line is a major work

Circello Wind FARM
Location: Piana Barone, Costa Pagliara – Circello (BN) Total production:

Ponte Albanito Wind Park
Place: Ponte Albanito – Municipality of Foggia (FG) Total production:

Abruzzo Freight Centre
Location: Località Staccioli – S.S. 5 Tiburtina Valeria Manoppello ( PE

“RUBINO” REAL ESTATE COMPLEX MUNICIPALITY OF CHIETI
Client: Iniziative Immobiliari s.a.s. Contract amount: € 12,400,650 The project

“ALCIONE” REAL ESTATE COMPLEX MUNICIPALITY OF SAN LAZZARO DI SAVENA (BOLOGNA)
Client: Edilizia Adriana Soc.Coop. A.R.L. Contract amount: € 14,276,445 The

Car Park – Municipality Of Chieti
Client: Municipality of Chieti Contract amount: € 7,913,035 The project

VAL PESCARA INTERMODAL CARGO TERMINAL
Client: Intermodale S.r.l. (SPV concessionaire of the Abruzzo Region for

“AGORÀ” REAL ESTATE COMPLEX MUNICIPALITY OF CHIETI
Construction of a real estate complex comprising residential units, offices

MARTIGNANO S.S. 47 VALSUGANA NATIONAL ROAD
S.S. 47 Valsugana (TN) Section: Ponte Alto – Trento Nord

Allocco Tunnel
Length: Northbound barrel (55.69+1,655.07); Southbound barrel (72.12+1693.33) Excavation section: 155 m³

MESTRE – UDINE RAILWAY LINE
Building works, railway tracks and electrification system needed to widen

GESTIONE GOVERNATIVA SANGRITANA RAILWAYS
Concession contract for upgrading and improvement of the Adriatico Sangritana

NATIONAL ROAD E45 ORTE – RAVENNA
Works to build sections adjacent to the towns of Valbiano,

Flaminia S.S.3
Customer: Anas S.p.A. Work cost: € 77,642,597 This work involved the construction

A6 Tourin – Savona Motorway
Performance of works to widen the motorway and improve safety

HADATH-SYRIAN BORDER HIGHWAY
Saoufar-Mdeirej East Section Client: Lebanese Republic Contract amount: € 52,400,771

FRANCAVILLA – S.S. 16 ADRIATICA NATIONAL ROAD
Works to build the Francavilla al Mare alternate route, with

CONTURSI A3 SALERNO – REGGIO CALABRIA MOTORWAY
Works to modernise and upgrade to Type 1/b of CNR/80